about us
data centres
Modern production of high-tech data centers for industrial
bitcoin mining with maximum automation of operational processes.
takefuture.container Air cooling - Mobile data centers with air cooling
- Number of posts: from 150 to 300;
- Type and voltage of power supply: 3-phase, 380 V;
- Installed power: 665 kW to 1.85 mW;
- Maximum load per post: 4.4 to 6.0 kW;
- Ventilation system: forced ventilation, total airflow from 127,200 to 254,200 m3/h; division in "cold" and "hot" aisles;
- Filtration system: passive, G3 filters;
- Networking equipment: Mikrotik;
- Remote control of power supply and shutdown;
- Remote smart control of fans depending on chip temperature;
- Gas fire extinguishing system;
- Security and fire system with a function of total power off in case of fire and output of operative notification of an emergency situation to the user's device;
- IP-video surveillance system;
- Uninterruptible power supply system for critical systems;
- Technical documentation and operational markings in Russian and English;
Full-cycle production - from design to commissioning
Energy-efficient and environmentally friendly production and operation technologies
Compliance with strict international and national standards for energy and fire safety
Technological solutions to minimize maintenance
Maximum degree of automation and unique software and mathematical solutions for efficient remote control of operational processes
Wide range of additional equipment to be installed according to the customer's request
Extended after-sales service programs, as well as technical upgrades to to meet the changing conditions of bitcoin mining
INVESTOR relations
info@takefuture.io